Flight MH370/2014-03-08/02-28-05 MYT: Difference between revisions

MH370 DECODED
Jump to navigation Jump to search
CSV import
m Text replacement - "{{ChronSummary" to "{{subst:ChronSummary"
Line 17: Line 17:
|description=IFE establishes Data-3 X.25 circuit over SATCOM for BITE (Built-In Test Equipment) application.
|description=IFE establishes Data-3 X.25 circuit over SATCOM for BITE (Built-In Test Equipment) application.
}}
}}
{{ChronSummary
 
|Direction=air
<p>Start Chron Summary</p>
|AnchorID=022805
<div class="chron air" id="#022805">
|DateMYT=8 March 2014
<p>8 March 2014 &nbsp; [[Flight MH370/2014-03-08/02-28-05 MYT|02:28:05 MYT]]</p>
|TimeMYT=02:28:05
<p>IFE establishes Data-3 X.25 circuit over SATCOM for BITE (Built-In Test Equipment) application.</p>
|LinkFromChron=Flight MH370/2014-03-08/02-28-05 MYT
<!-- <p>{{{DateUTC|}}} {{{TimeUTC|}}}</p> -->
|DateUTC=7 March 2014
</div>
|TimeUTC=18:28:05
<p>End Chron Summary</p>
|Summary=IFE establishes Data-3 X.25 circuit over SATCOM for BITE (Built-In Test Equipment) application.
}}

Revision as of 11:09, 17 August 2026

Event Summary

02:28:05 MYT Saturday 8 March 2014

Return to Timeline

The IFE sets up a Data-3 ground connection (X.25 circuit) over SATCOM for a BITE application after the SATCOM link is re established.


Event Details

  1. Safety Investigation Report MH370/01/2018 Satellite Ground Station Logs - Key Observations

    The IFE sets up a Data-3 ground connection (X.25 circuit) over SATCOM for a BITE application after the SATCOM link is re established.


Notes



Start Chron Summary

8 March 2014   02:28:05 MYT

IFE establishes Data-3 X.25 circuit over SATCOM for BITE (Built-In Test Equipment) application.

End Chron Summary